Items attributes for Finished Goods specific to Paper Industries -
Item GSM - Thickness
Quality -Super Cromo, Eeco Board Etc.
GSM Range
Size (Length & Width)
Grade
Unit of Measure and Alternate Unit of Measure
Item Variants used for handling the multiple sizes of the Finished Goods Items.
Stock Keeping Units as per varinat and location wise for getting the Finished Goods Inventory as per Size, Quality and Grade Wise. Bill of Material & Production Routing Master
Semi Finished Items ( Paper ROLL)
Waste Paper is the raw material for Roll Preparation.
System is capable to handle the different qualities of waste paper.
Waste Paper is consumed for preparing the ROLL TOP Layer, Middle Layer & Bottom Layer.
Chemical, Packing Items, Stores and Spares & Fuel Item Inventory and consumption
Broke Inventory Manegement (Broke Calculations)
Manufacturing Process:
ROLL Preparation
Cutting ROLL into Finished Items
Packing into Bundle
Bill of Material & Production Routing Master
Direct Customer & Agents with multiple ship to addresses (Local/Foreign)
Warehouse Management for Waste Paper, Chemical, Fuel, Spares, Roll and Bundle